Electrical Panel Upgrades in Vaughan

Tron Electrical & Automation upgrades panels and 100A services to 200A across Vaughan, from our shop at 71 Silton Road in Woodbridge. We handle the load calculation, the ESA permit and the Alectra disconnect and reconnect, and most installations are completed in one day.

  • ESA Licence #7016193
  • Serving Toronto & GTA Since 1972
  • 500+ Five-Star Google Reviews
  • 99% ESA First-Pass Rate
  • Open 24/7
647-492-1989 Call Now

Request Service or Assessment

Response Within 1 Hour. Premium Service.

Submit and we'll text you right away, reply with photos of your panel or project. We never sell or share your number.

Panel upgrades in Vaughan: what we see

Many Vaughan homes were built in the 1980s and 1990s with 100A services and panels that are now full. Owners call us when they add a pool, hot tub, heat pump, EV charger, finished basement or second suite, and the existing service can no longer carry it.

Most Vaughan subdivisions have underground services, so a standard 100A to 200A upgrade usually falls within our typical price range. Older homes in Woodbridge and Maple sometimes still have original panels with no breaker space left, or brands that no longer accept available breakers — a panel replacement can solve that without a full service upgrade, and we will tell you which one your home needs.

Larger custom homes in Kleinburg and Maple often need more than 200A, or a subpanel for a pool house, garage or addition. Every quote starts with a measured load calculation, so the service is sized to what you plan to run.

Modern 200A breaker panel installed and labelled by Tron Electrical

Hydro & ESA in Vaughan

Vaughan is served by Alectra Utilities. A service upgrade needs an Alectra disconnect and reconnect and an ESA permit. Tron files the ESA permit, books the Alectra appointment around your installation day, meets the ESA inspector and hands you the certificate your insurer or a future buyer will ask for.

What it costs in Vaughan

Typical Tron pricing for a standard underground Hydro service:

  • 100A to 200A service upgrade — $3,500 to $5,000+
  • 100A panel replacement — $2,000 to $3,500
  • Fuse box to breaker panel conversion — $2,500 to $3,500
  • Subpanel installation — $1,000 to $1,500

These ranges include the ESA permit, inspection coordination and the Hydro disconnect and reconnect scheduling. Overhead services can cost more when the mast, weatherhead or meter base must be replaced. You get a firm written quote after the on-site assessment.

How Tron handles it

  1. 1

    We Determine What Your Home Needs

    We assess the existing service, panel and planned electrical loads.

  2. 2

    We Handle the Coordination

    Tron manages the required Hydro, permit and ESA process.

  3. 3

    We Complete the Upgrade

    We install, test and prepare the upgraded system for inspection and use.

Areas we cover in Vaughan

Vaughan panel upgrade questions

Alectra Utilities disconnects and reconnects the service. Tron books that appointment for you and schedules the installation around it.

The physical installation is typically completed in one day. Alectra scheduling and the ESA inspection are booked around it.

Not always. We do a load calculation first; sometimes the existing service has room, or a panel replacement or subpanel is enough.

Typically $3,500 to $5,000+ for a standard underground service, including the ESA permit and Hydro coordination. You get a firm written quote after the assessment.

Related

Need more power in Vaughan?

Find out whether your home needs a panel replacement, a 100A-to-200A service upgrade or another electrical capacity solution.

ESA Licensed • 500+ Five-Star Google Reviews • Serving Toronto & GTA Since 1972

Is your panel safe? Send us a photo — a master electrician will tell you.