Industrial machinery reconnected after a plant relocation project
ESA Licensed Industrial Electrical Specialists
ESA Licence #7016193
Fully Insured & Bonded

Machinery Connections & Relocation Without Production Loss

⭐⭐⭐⭐⭐ 5.0 on Google (500+ reviews) · 4.9/5 on HomeStars (338 reviews) · HomeStars Best of the Best 2023

HomeStars Best Award Winner 2023
HomeStars Best of the Best Winner 2023
HomeStars Verified
ECRA/ESA Licence #7016193 — Electrical Safety Authority
Google Verified Reviews 5.0
Google Guaranteed — Tron Electrical & Automation

ESA Licensed • 500+ Reviews • Since 1972

MCC tie-ins, feeders, conduit and control wiring for new equipment installs and plant reconfigurations — planned shutdowns, LOTO procedures, and start-up testing handled by ESA-licensed crews.

Services: MCC tie-ins & feeders • Conduit & cable tray • Disconnects & LOTO • Relocation & load balancing • Start-up testing & commissioning

  • ESA Licensed
  • 500+ Five-Star Google Reviews
  • 50+ Years in the GTA
  • Strict LOTO on Every Job

Request Service or Assessment

Response Within 1 Hour. Premium Service.

Submit and we'll text you right away, reply with photos of your panel or project. We never sell or share your number.

The Three Questions Homeowners Ask Us Most

“We can't have our production line down for more than a weekend.”

We plan the full disconnect-move-reconnect sequence in advance and schedule crews to complete the work within your maintenance window, including overnight and weekend shifts.

“Our last contractor didn't label anything and we couldn't troubleshoot after the move.”

Every connection point is labeled and documented with as-built drawings delivered at project close, so your maintenance team always knows what's connected where.

“We're worried about safety during the disconnect phase.”

Every job follows strict lockout-tagout procedures with verified isolation testing before any wire is touched — no exceptions, regardless of schedule pressure.

What You Get When Your Machinery Move Is Done Right

Industrial machinery reconnected after a plant relocation project

Machinery Reconnected on Schedule

Feeders and controls installed to spec, tested before restart.

Motor control wiring completed during a machinery connection project

Properly Sized MCC Tie-Ins

Feeder and MCC connections sized to actual equipment load.

Industrial switchgear supporting a relocated production line

Safe Isolation, Every Time

Strict LOTO procedures protect crews and equipment during every move.

⭐⭐⭐⭐⭐ Trusted by GTA manufacturers with 500+ five-star Google reviews.

"Tron relocated our entire stamping line over a long weekend shutdown, LOTO'd every disconnect, and had us running Monday morning."
P. Anand — Vaughan
"New CNC install needed a dedicated feeder and disconnect fast. Tron sized it right the first time and we passed ESA inspection immediately."
M. Bianchi — Scarborough
"Careful, methodical crew — every circuit labeled before they moved a single machine. Exactly what we needed for a plant reconfiguration."
K. Wu — Mississauga
"They coordinated with our equipment vendor on the VFD tie-in without a hitch. Smooth start-up, no surprises."
S. Boucher — Etobicoke
"LOTO discipline was excellent — our safety officer had zero concerns during the walkthrough."
N. Petrov — Brampton
"Best experience we've had relocating heavy equipment. Load balancing on reconnect was spot on."
R. Alvarez — North York

Plant Moves Executed With Zero Surprises

Relocating or reconnecting production equipment without proper planning means unplanned downtime, mis-sized feeders, and safety exposure during disconnection.

Tron Electrical has connected and relocated industrial machinery across the GTA since 1972 — MCC tie-ins, feeders, and control wiring installed to spec, with strict LOTO procedures on every job.

Your maintenance window is our deadline. We schedule disconnects, moves, and reconnections to fit your planned shutdown, not the other way around.

Complete Machinery Connection & Relocation Services

MCC Tie-Ins & Feeders

Properly sized feeders and motor control center tie-ins for new or relocated equipment loads.

Disconnects & LOTO

Dedicated disconnect switches and strict lockout-tagout procedures for safe isolation.

Conduit, Cabling & Control Wiring

Power cabling, cable tray, and control wiring integration with PLC and automation systems.

Equipment Relocation Planning

Shutdown coordination, load balancing on reconnection, and comprehensive circuit labeling.

Transformer Feeds & VFD Tie-Ins

Transformer-fed circuits and variable frequency drive installations for upgraded equipment.

Start-Up Testing & Commissioning

Insulation resistance, ground continuity, and start-up support before equipment goes live.

Why Facility Managers Choose Tron for Machinery Moves

  • ESA Licensed — industrial machinery crews
  • 50+ years relocating and reconnecting production equipment
  • 500+ five-star Google reviews from GTA manufacturers
  • Strict LOTO procedures on every disconnection
  • Shutdown scheduling built around maintenance windows
  • As-built drawings and full documentation on every job
  • ESA permits & Hydro coordination handled directly
  • Experience from CNC machines to full conveyor lines

A Coordinated Move From Disconnect to Restart

  1. 1

    Site walk to map existing connections and plan the new layout

  2. 2

    Fixed-price proposal with shutdown window and LOTO plan

  3. 3

    ESA permits filed & shutdown scheduled with operations

  4. 4

    Safe disconnection, relocation & reconnection under LOTO

  5. 5

    Load balancing, start-up testing & as-built documentation

Built for Manufacturers, Warehouses & Plant Reconfigurations

Whether you're adding a new production line in Vaughan, relocating machinery during a Scarborough plant reconfiguration, or swapping equipment on a tight maintenance window, Tron Electrical scales from single-machine moves to full-floor reconfigurations.

Machinery Connections Across Toronto, Vaughan & the GTA

We connect and relocate industrial machinery for manufacturing facilities in Toronto, North York, Scarborough, Etobicoke, Vaughan, Mississauga, Richmond Hill, Markham, Thornhill, and surrounding GTA industrial parks.

TorontoVaughanNorth YorkEtobicokeScarboroughRichmond HillMarkhamThornhillKleinburgKing CityWoodbridgeMississaugaOakvilleBramptonAuroraMapleConcordUnionville
Common Questions

Machinery Connection Questions Answered

Still have questions? Call 647-492-1989

Planning a Machinery Move or New Equipment Install?

Call Tron Electrical for a coordinated connection or relocation plan that protects your production schedule. We handle ESA permits, LOTO procedures, installation, and start-up testing from start to finish.

  • ESA Licensed
  • 500+ Five-Star Google Reviews
  • 50+ Years in the GTA
  • Strict LOTO on Every Job

Is your panel safe? Send us a photo — a master electrician will tell you.